What I take on
01
Luxury vinyl plank and laminate
02
Engineered and solid hardwood
03
Tear-out and haul-away
04
Subfloor repair and leveling
05
Trim, baseboard and thresholds
In progress and finished



Before the first plank goes down
New flooring needs to sit in the room it is going into for a couple of days before installation, so it can take on the moisture level of the house. I bring it in, stack it, and wait. Then the old floor comes out, the subfloor gets checked and repaired, and the new floor goes down over a clean, flat surface. It adds time to the schedule and it is the difference between a floor that stays tight and one that pops a seam in August.
- Old floor removed, tack strips and staples pulled
- Subfloor checked for soft spots, water damage and flatness
- New material acclimated in the room before installation
- Expansion gaps left at every wall and under every casing
- Baseboard, transitions and thresholds finished